大理蚊雌机械设备有限公司

  News Center

    Major projects     Company news     Industry News

Home > News > Major projects

110KV substation AC and DC power systems put into operation a one-time success
date:2012-09-26    Views: 6166

  I produced the AC-DC power supply system (60A charging cabinet side 1, 33 road feeder cabinet side 1, side 2 battery cabinet, 200A AC distribution cabinet 2 surface, UPS and communication power cabinet 1 side) succeeds Jiang Su Shengchuan material Technology Co., Ltd. annual output of 180,000 tons of nickel based stainless steel products project 110KV substation total reduction of new construction put into operation.

      Jiang Su Shengchuan Materials Technology Ltd. annual output of 180,000 tons of nickel-based stainless steel products project (Suzhou Times Group, Weihua investment company) joint venture construction and maintenance from Suzhou Times Group investment companies, with a total investment of 10 million yuan, covers an area of 242 acres and an investment 150 million yuan, the construction of two main production workshop, an office building, two dormitories, a dining hall, with a total construction area of 91,162 square meters.

Previous      Next
    About us  |  Product  |  Program  |  News  |  Service  |  Recruitment  |  Contact us

Copyright © 2005-2016   Haitailin Technology Shenzhen Co., Ltd.   GuangDong ICP No. 09084922 -1

什邡市| 衡水市| 平山县| 石棉县| 保康县| 亚东县| 象州县| 彰化市| 富川| 大厂| 霸州市| 行唐县| 玉龙| 东明县| 黄龙县| 桂林市| 凤台县| 革吉县| 鱼台县| 东宁县| 湘阴县| 丰顺县| 浑源县| 会理县| 彩票| 阜南县| 永嘉县| 克山县| 清镇市| 会泽县| 方山县| 同仁县| 来凤县| 宜川县| 平和县| 乌什县| 五指山市| 广饶县| 石屏县| 额尔古纳市| 婺源县|